PDF OUTPUT 1 — Draft Project Contract Pack
Generate a PDF titled:
Draft Quotation and Simple Domestic Building Contract Pack
Include:
Cover page
Project reference
Client details
Contractor details
Property address
Project screening summary
Contract route
Scope summary
Specification reference
Drawing register
Contract sum
VAT position
Payment schedule
Programme
Insurance summary
Defects period
Variation procedure
Dispute process
Contract administration interest
Declarations
Signature page
PDF OUTPUT 2 — Contract Information Sheet
Generate this instead of the simple contract if:
F1.32 = RIAI Contract; or
F1.32 = Other recognised contract
Title:
Project Information Sheet for Recognised Contract Form
Include:
Project details
Client details
Contractor details
Recognised contract selected
Specification reference
Drawing register
Contract sum
Programme
Contract administrator details
Contract administration warning
Standard wording:
This document does not replace the recognised contract form selected by the parties. It is intended to summarise project information, specification references, drawings, payment details and administration requirements for inclusion or reference in the recognised contract documents.
INTERNAL NOTIFICATIONS
Notification 1 — Contractor Copy
Send to: Contractor email
Subject: Draft Project Contract Pack — {Project Reference}
Notification 2 — Client Copy
Send to: Client email
Conditional: Only if Client Copy Required = Yes
Notification 3 — PHC Internal Lead
Send internally if any of the following apply:
Estimated value over €150,000
BCAR / Assigned Certifier = Yes or Not sure
Structural works included and engineer not appointed
Contract administration interest = Yes or Not sure
Contract route = RIAI Contract
Snagging inspection required = Yes
Subject:
Potential Contract Support Lead — {Project Reference}
EXAMPLE TEST ENTRY
Project Name: Murphy Extension and Attic Works
Project Type: Extension with attic works and wall removal
Estimated Contract Value: €75,000 – €150,000
Domestic Project: Yes
Planning Permission: Not sure
BCAR / Assigned Certifier: Not sure
Structural Works: Yes
Engineer Appointed: Not sure
Contract Route: Simple Domestic Building Contract
Specification Reference: SPEC-00045
Contract Sum Ex VAT: €85,000
VAT Applicable: Yes
Payment Structure: Fixed staged payments
Contract Administration Interest: Yes
Services of Interest: Stage inspections, snagging inspection
CORE CONTRACT WORDING FOR PDF
Status of Document
This document is intended as a draft quotation and short-form building contract for simple domestic works. It should be reviewed by both parties before signing. It is not intended for complex projects, projects requiring detailed professional administration, or works where statutory certification requirements have not been confirmed.
Scope
The Contractor shall carry out the works described in this agreement, together with the drawings and Specification Schedule identified below. The Specification Schedule forms part of this agreement. Where there is any inconsistency between the documents, the written specification shall take priority unless otherwise agreed in writing.
Specification Link
Specification Schedule Reference: [SPEC ID]
Version Date: [DATE]
The parties confirm that this is the version of the specification relied upon for the contract sum.
Contract Sum
The contract sum is €[amount] excluding VAT / including VAT. This sum is based only on the documents listed in this agreement. Items not expressly included are excluded unless confirmed in writing.
Variations
No variation shall be carried out unless agreed in writing before the work proceeds, except where urgent works are required to protect the property or persons. Any agreed variation shall record the description of the change, cost adjustment, and any effect on completion time.
Payment
Payments shall be made in accordance with the agreed payment schedule. The Contractor may issue invoices at the agreed stages. The Client shall pay properly due invoices within [x] days, subject to any genuine written dispute notified promptly.
Completion
Practical completion shall occur when the works are substantially complete and capable of normal use, except for minor snagging items. Snagging items shall be recorded and completed within a reasonable period.
Defects
The Contractor shall make good defects arising from defective workmanship or materials notified within the agreed defects period after practical completion. This does not include damage caused by misuse, lack of maintenance, third-party works, normal wear and tear, or matters outside the Contractor’s control.
Insurance
The Contractor shall maintain appropriate public liability insurance and, where applicable, employer’s liability insurance. The Client remains responsible for notifying their insurer of the proposed works and for maintaining insurance for the existing dwelling unless otherwise agreed in writing.
Unforeseen Conditions
The contract sum does not include unforeseen ground conditions, hidden defects, concealed services, asbestos, rot, structural defects, or other matters not reasonably identifiable before opening-up works, unless expressly included in the Specification Schedule.
Disputes
The parties shall first attempt to resolve any dispute by discussion. If unresolved, either party may propose mediation. This does not prevent either party from pursuing any legal remedy available under Irish law.
CORE CONTRACT WORDING FOR PDF
Status of Document
This document is intended as a draft quotation and short-form building contract for simple domestic works. It should be reviewed by both parties before signing. It is not intended for complex projects, projects requiring detailed professional administration, or works where statutory certification requirements have not been confirmed.
Scope
The Contractor shall carry out the works described in this agreement, together with the drawings and Specification Schedule identified below. The Specification Schedule forms part of this agreement. Where there is any inconsistency between the documents, the written specification shall take priority unless otherwise agreed in writing.
Specification Link
Specification Schedule Reference: [SPEC ID]
Version Date: [DATE]
The parties confirm that this is the version of the specification relied upon for the contract sum.
Contract Sum
The contract sum is €[amount] excluding VAT / including VAT. This sum is based only on the documents listed in this agreement. Items not expressly included are excluded unless confirmed in writing.
Variations
No variation shall be carried out unless agreed in writing before the work proceeds, except where urgent works are required to protect the property or persons. Any agreed variation shall record the description of the change, cost adjustment, and any effect on completion time.
Payment
Payments shall be made in accordance with the agreed payment schedule. The Contractor may issue invoices at the agreed stages. The Client shall pay properly due invoices within [x] days, subject to any genuine written dispute notified promptly.
Completion
Practical completion shall occur when the works are substantially complete and capable of normal use, except for minor snagging items. Snagging items shall be recorded and completed within a reasonable period.
Defects
The Contractor shall make good defects arising from defective workmanship or materials notified within the agreed defects period after practical completion. This does not include damage caused by misuse, lack of maintenance, third-party works, normal wear and tear, or matters outside the Contractor’s control.
Insurance
The Contractor shall maintain appropriate public liability insurance and, where applicable, employer’s liability insurance. The Client remains responsible for notifying their insurer of the proposed works and for maintaining insurance for the existing dwelling unless otherwise agreed in writing.
Unforeseen Conditions
The contract sum does not include unforeseen ground conditions, hidden defects, concealed services, asbestos, rot, structural defects, or other matters not reasonably identifiable before opening-up works, unless expressly included in the Specification Schedule.
Disputes
The parties shall first attempt to resolve any dispute by discussion. If unresolved, either party may propose mediation. This does not prevent either party from pursuing any legal remedy available under Irish law.